The safety audit was conducted according to procedure, using the checklist provided by Yefe Nof City Roads Co.
The axis includes the connection between the Ruppin Interchange to Hativat Golani St. This 2 km long road is highly complex from an engineering standpoint, and includes a two-way road with two lanes each way and multiple bridges. The safety audit was conducted in preparation for the opening of the road to traffic.