Preparation of a Development Program for the Hedera Water Treatment Plant

The water treatment facility in Hadera is one of the largest of its kind in the world. It is located south of Orot Rabbin Power Plant in Hadera (between the power plant and the Hadera River), and supplies water to the national water system.
The facility was founded by H2ID Group, co-owned by IDE-IDE Technologies Ltd and Shikkun & Binui, using the BOT method (Build, Operate, Transfer). After a period of 25 years, it will be given to the state. Construction on the facility had commenced in June 2007, and it began to supply water in December 2009. The paving and development works were completed in March 2010.
Our firm planned the earth works and terrain leveling for the various facilities of the project, as well as the road system and parking spaces in its vicinity.

1 2 3 4