Ramat Yishai – Ha’Erez St.

Ha’Erez St. in Ramat Yishay is a main axis road that connects the main entry junction from Highway 75 to the southern area of the settlement. The axis is a 900 m long one-way street with new traffic arrangements and roundabouts throughout.
As part of the project, the entire street was dug up, a drainage system was installed in accordance with the master plan, a lighting system was installed and trees were planted.
The job required planning complex temporary traffic arrangements. The final, one-way street traffic arrangements allowed full utilization of the road and increased the number of public parking spaces, which the street previously had not had enough of.