Our firm planned the axial road system of the industrial zone, with a large, new shopping complex at its center. The road is approximately 1.25 km long and includes a two-way street with one or two lanes each way. Some of the junctions were designed with traffic lights, and the main arterial road was connected to the junction with Highway 75.
We copied all existing infrastructure systems and connected all existing businesses to the new roads in the best way possible. The project included physical design, traffic engineering, systems coordination and overseeing the planning of all consultants involved. Planning also had to be coordinated with the municipal water companies.